Refractory Petrochemical Plant Construction

The successful construction of a modern oil refinery in Korea was performed, the current UAE RRE PROJECT CO-BOILER refractory construction are being done. An increasing number of domestic and international construction and RFCC process of RFCC Reactor / Regenerator Refractory Peripheral body and can perform construction and repair work of engineers and technicians has construction.



Refractory construction for power plant

Successfully performed to Refractory construction of SK Tufanbeyli PROJECT, POSCO Seokmun Energy, Hyundai Oil Bank Daesan power plant #10 And has a construction engineer and technician can perform the refractory construction and repair work.



Refractory dry-out

By using a high-efficiency gas burners and electrical equipment and perform Curing Dry-out in accordance with the procedures and work instructions
Use of the refractory product by removing the moisture contained in the refractory material to improve the quality and durability.



DRY-OUT Main construction

SK NEW FCC PROJECT DRY-OUT


NIOEC ARAK RFCC DRY-OUT


VGO FCCPROJECT